• 136 Ceres Drive, Thurgoona, NSW 2640

Email

  • engineering@bos-ind.com

Phone

  • (02) 6022 4003

Arc Flash Study (2000 Buses)

  • Full extent of Arc Flash Study undertaken
  • More than 500 Switchboards and 2000 buses
  • PPE assignment for each bus completed
  • Provided comprehensive drawing pack of site electrical system as it was previously poorly documented